Record emergency measure
An emergency measure (Notfallmaßnahme) is an immediate action on site, e.g. power cut, stand closed or area cordoned off. You record it on the phone; the production office sees it as soon as it has reached the server.
Who records
Section titled “Who records”Rights as for “Inspections & defects”:
- Agency: everywhere, also without a location.
- Sector lead, technical lead and contractor: in their own sectors.
- Customer: read only.
Recording
Section titled “Recording”- In the sector list tap the siren icon at the top (location: the chosen sector), or at a stand top right (location: the stand).
- Enter what you did, optionally take a photo. If the server cannot read the photo (e.g. HEIC), the measure is saved without it and you get a notice.
- “Save”.
At a stand, the stand’s sector always counts. Without network the measure goes into the queue (“x changes waiting”) and is sent as soon as there is reception (Working offline); it is stored exactly once, even if the connection drops while sending.
Alert to the operations lead
Section titled “Alert to the operations lead”When the measure reaches the server, a broadcast goes to the event’s agency (phone feed, then SMS) with location and description.
List in the production office
Section titled “List in the production office”Under Emergency measures in the event, the open measures are listed, oldest first: time (recorded on the device), location, who recorded it, photo. “Done” removes it from the list. Recording, changes and Done are in the log, with channel (“Mobile” or “App”).
Change the description
Section titled “Change the description”“Edit” in the list changes the description of an open measure, e.g. to correct or complete it. Location and photo stay as recorded; a measure cannot be deleted.
- Only the person who recorded the measure changes it directly. Everyone else with edit rights sends a counter-proposal to that person; the form says who it goes to.
- Older measures without a stored creator are changed directly by anyone with edit rights.
- “Done” and recording stay direct for everyone with the right. A counter-proposal filed before the measure was marked done can still be approved; after that the measure can no longer be edited.
- A change sends no new broadcast. The alert to the operations lead stays as it was sent.