Timeline
The timeline shows all objects of an event on one shared time axis, from the first setup to the last teardown, together with milestones and authority appointments. That way you spot bottlenecks between setup and opening. The timeline is read only; you change time windows and tasks on the object.
Who sees it
Section titled “Who sees it”The “Schedule” entry appears for everyone with read access to “Schedule, changeovers, tasks”. Each person sees only the objects they may read: agency and customer all, sector leads and contractors only their own. Stand operators do not see the timeline.
“List | Board | Timeline” switches between the stand list, the board and the timeline.
Layout
Section titled “Layout”- Rows: one object per row, grouped by area (in the order of the settings, “No area” last). The status shows in front as a symbol; an open change shows “Change pending”. A click opens the object.
- Details: a click or tap on a bar shows the kind, value, period and note of the time window; on a diamond it shows the appointment, its time and whether it is done. Escape or a click elsewhere closes the details.
- Header: the phases on top (setup before the event days, operation on the event days, teardown after), the days below. Event days show at normal emphasis and are lightly shaded in the rows; setup and teardown days are muted, the phase above names them.
- Time: all times in Europe/Berlin. When the clocks change a day has 23 or 25 hours; the axis shows that to scale.
- Filters: area and sector chips; without a selection all objects show. The search finds number, exhibitor or offer like in the stand list and combines with the chips.
- Day: one chip per day of the range shown (e.g. “Thu, 10/06/2027”), setup and teardown days muted with “Setup” or “Teardown”. A click shows only that day from 0:00 to 24:00 and only rows with a time window or date on it, combined with area and sector; clicking it again shows all days.
- Groups: a click on the area collapses or expands the group; with more than 30 rows only the first starts open.
- Range: the axis always spans at least from the event’s first setup day to its last teardown day (see Event; if not set, the event days). Time windows and dates outside it widen it. If dates lie outside, “Show all dates” shows the whole span. If now lies within the range, a vertical line marks the current time.
Cancelled stands have no row, and their time windows do not widen the axis.
Legend
Section titled “Legend”The legend sits above the axis. The kind of time window shows as line shape, not colour. Colour stands for the area only.
| Shape | Meaning |
|---|---|
| thin line | Setup |
| bar | Operation |
| dashed bar | Changeover |
| dotted line | Teardown |
| diamond | Appointment (task), filled = done |
| outlined box | Authority appointment (only with the group) |
At the very top, the group “Milestones” has one row per milestone with a planned time, sorted by time: status symbol, title and time on the left, a diamond at the planned time on the right; filled means reached. Clicking the title or the diamond opens the milestone in the milestone list. Clicking “Milestones” collapses and expands the group; the arrow icon to its right opens the milestone list. Area and sector filters and the search do not apply to this group, the day filter does.
Authority appointments
Section titled “Authority appointments”Below the milestones, the group “Authority appointments” lists, sorted by time:
- every meeting of the kind “Authority appointment” (planned, running or closed; not cancelled) as a box across its duration, with its status symbol in front. Clicking the title opens the meeting.
- every inspection appointment of an object as “Inspection S-14 · Crêpes”: a box from start to end, a diamond without an end. Clicking it opens the object.
You see a meeting if you may read the schedule and the meeting itself (as under Meetings). You see an inspection appointment only for objects you see on the timeline and may read under Inspections & defects. The object’s own row also shows its inspection appointment as a diamond.
Authority appointments do not widen the axis. Those outside the first setup day to the last teardown day, even weeks before, are listed below the axis under “Authority appointments outside the period”, with date, time, title and link, sorted ascending. This list ignores the day filter and “Show all dates”. The group follows the day filter like the milestones; area and sector filters and the search apply to neither. Without authority appointments in the period there is no group, without any outside it no list.
Conflicts
Section titled “Conflicts”For the agency the timeline marks conflicts: two objects overlap on the site plan while both are in a time window, for example a stand on an escape route. A dashed band across all rows shows the time of the overlap; below the legend each conflict lists its reason, such as “Fri, 11/06/2027, 07:00–09:00 · R-A · Rettungsweg A · S-14”.
- What counts is the area (width × depth) around the position at that time, so for a changeover the position in the changeover window.
- Edges that only touch are no conflict.
- Left out: cancelled, not assigned and free objects, objects without width or depth and objects without a position. A sub-object (e.g. FOH position) and its object never conflict.
- With a filter, a conflict shows when at least one of the two objects is visible; with a day filter only when it falls on that day.
The timeline does not resolve conflicts; move the object on the site plan or change its time window.
Timeline of an object
Section titled “Timeline of an object”On an object, “Overview | Timeline” switches to the timeline of that object: one row for its time windows, one row per requirement across its time window, one row with the appointments of its tasks and, with read rights on Inspections & defects, one row with its inspection appointment.
When something does not load
Section titled “When something does not load”If the data cannot be loaded, the page shows “Timeline could not be loaded” instead of an empty axis. Reload the page.