Status symbols
Aetherial shows a status through the shape of a symbol, not its colour. That way the status stays readable in greyscale, in light and dark mode and with colour vision deficiency. The status text always appears next to the symbol; hovering shows it as a tooltip as well.
The basic rule: the fuller the circle, the further along things are.
| Shape | Symbol | Basic meaning |
|---|---|---|
| Dashed ring | Requested, expected, in planning | |
| Half filled | In progress, in discussion, arrived | |
| Full | Confirmed, inspected, done | |
| Ring with dot | Change pending – something is waiting for a decision | |
| Ring with dot, red | Open defect (the only signal colour) | |
| Slash | Absent, do not assign, cancelled | |
| Empty, faint ring | Free, nothing has happened yet | |
| Ring with pause sign | Waiting for a place to free up | |
| Ring with triangle | Change requested – a wish is waiting for the agency | |
| Full, muted | Closed and archived |
Planning
Section titled “Planning”Planning status of a stand (planning_status). Shown in the stand list (status view “Planning”) and in the header of the object detail view.
| Symbol | Status | Meaning |
|---|---|---|
| Free | The stand has not been assigned yet. | |
| Inquiry | There is an inquiry or stand request, but no confirmation yet. | |
| In discussion | The agency is clarifying details with the exhibitor. | |
| Confirmed | The stand is firmly assigned. | |
| Do not assign | The stand is meant to stay empty. | |
| Cancelled | The confirmation was withdrawn. |
On site
Section titled “On site”On-site status of a stand (onsite_status). Shown in the stand list when you switch the status view to “On site”.
| Symbol | Status | Meaning |
|---|---|---|
| Expected | The exhibitor has not arrived yet. | |
| Arrived | The exhibitor is there and setting up. | |
| Inspected | The stand has passed inspection (Abnahme). | |
| Open defect | The inspection found a defect (Mangel) that is still open. | |
| Absent | The exhibitor did not show up. | |
| Teardown OK | The stand was inspected after teardown without objection. |
Status of a whole event. Shown in the header of the event overview. How the status changes is described under Events.
| Symbol | Status | Meaning |
|---|---|---|
| Planning | The event is being prepared. | |
| Live | The event is running. | |
| Closing | The event is over, follow-up work is under way. | |
| Archived | The event is closed and read-only. |
Temporary structure notice
Section titled “Temporary structure notice”Progress of a temporary structure’s notice to the building authority. Shown in the list under Temporary structures.
| Symbol | Status | Meaning |
|---|---|---|
| Draft | The notice is prepared but not yet with the operator. | |
| With operator | The operator has received the link to sign. | |
| Signed | The signed copy is in. | |
| Submitted | The notice has been sent to the building authority. | |
| Confirmed | The building authority has confirmed receipt. |
Banner
Section titled “Banner”Progress of a banner in the banner plan. Shown under Sponsors & branding.
| Symbol | Status | Meaning |
|---|---|---|
| File requested | The print file has been requested from the sponsor. | |
| File received | The print file has arrived. | |
| File approved | The print file has been checked and approved. | |
| In print | The banner is being printed. | |
| Delivered | The banner is on site. | |
| Hung | The banner hangs at its position. | |
| Removed | The banner has been taken down. |
Sponsor
Section titled “Sponsor”Progress of a sponsor in the event. Shown under Sponsors & branding.
| Symbol | Status | Meaning |
|---|---|---|
| Requested | The sponsor has been asked. | |
| In discussion | The agency is negotiating with the sponsor. | |
| Confirmed | The sponsorship is fixed; its amount counts as income in Finance. | |
| Declined | The sponsor is not taking part. |
Change pending
Section titled “Change pending”| Symbol | Status | Meaning |
|---|---|---|
| Change pending | A change request for this object has not been decided yet. The affected fields are locked until the decision. |
The symbol appears in the header of the object detail view and in the changes inbox.
Stand number
Section titled “Stand number”A stand can have no number yet; the number is usually assigned shortly before the contract (see Sectors and objects). This symbol then replaces the number in the stand list, object detail, site plan, board and mobile app. PDFs, exports and messages read “no number”.
| Symbol | Meaning | Explanation |
|---|---|---|
| no number | No stand number has been assigned yet. |
Waitlist
Section titled “Waitlist”A stand request on the waitlist waits for a place that frees up later. Shown on the Stand requests page.
| Symbol | Status | Meaning |
|---|---|---|
| Waitlist | The agency has put the stand request aside for a place that frees up later. |
Change requested
Section titled “Change requested”An exhibitor has requested a change via the link of their submitted stand request, and the agency has not marked it done yet. Shown on the Stand requests page in the row and in the stand request, and on the event overview.
| Symbol | Status | Meaning |
|---|---|---|
| Change requested | At least one change request for the stand request is open. |
Stage program
Section titled “Stage program”An act the agency proposes to the customer, until the customer approves it. Shown in the timeline of the stage program before the act’s name; other act statuses have no symbol.
| Symbol | Status | Meaning |
|---|---|---|
| Proposal | The agency has proposed the act; the customer has not approved it yet. |
Other lists
Section titled “Other lists”Other lists use the same shapes with their own labels:
| List | ||||||
|---|---|---|---|---|---|---|
| Changes | – | Query | approved | open | rejected | – |
| Stand requests | Draft | In review | Transferred | Received | Rejected, Cancelled | – |
| Requirements (object detail) | requested | – | approved, done | change requested | – | – |
| Jour fixe | planned | running | closed | – | cancelled | – |
| Access | Invited | – | Signed in | – | – | Not invited |
| Walking permits | – | Partially approved | Approved | Requested | Rejected | – |
| Vehicle access | – | – | Approved | Reported | Rejected, Revoked | – |
| Deposit settlement | Deduction proposed | Approved, In transfer file | Transferred | With organiser | – | – |
| SEPA transfer files | – | Created | Transferred | – | Discarded | – |
| Deadlines | open | within 7 days | – | running | – | no date |
Budget
Section titled “Budget”Status of a budget line under “Finance” (see Costs and revenue).
| Symbol | Status | Meaning |
|---|---|---|
| Open | Planned, not ordered yet. | |
| Ordered | The order is placed. | |
| Invoiced | The invoice has been received. |
Deposits
Section titled “Deposits”Difference of a deposit under “Deposits” (see Deposits).
| Symbol | Difference | Meaning |
|---|---|---|
| Missing | No receipt recorded yet. | |
| As due | Received as due. | |
| Too little / Too much | The receipt differs from the amount due. | |
| Due unknown | Received, amount due not computable. |
The “Inspection after teardown” column shows the result of the inspection after teardown: OK (full), Defect (ring with dot, red) or not inspected yet (dashed ring). A settlement disputed by the exhibitor carries the same shape (ring with dot, red) labelled “Disputed”. The settlement and SEPA file status are shown in the rows “Deposit settlement” and “SEPA transfer files” under Other lists. Past deadlines carry the “Full, muted” shape.