Skip to content

Stage program

The stage program shows all stages of the event per day with their acts: bands, dance schools, DJs, speeches, walking acts and street music. Acts can be added one by one or imported from the program overview and the dance-school grid.

In the event navigation under “Program”. The timeline shows all stages and venues of the event. Stages are objects of type stage: you add them under Infrastructure or on the event overview, and they appear in the program by themselves. You add venues here (see below). Without stages and venues the timeline stays empty.

A stage is built: it is listed under Infrastructure, on the site plan, on the board and in the other planning lists. A venue is a place in the program only, without a build, for example for street music or walking acts. Venues are in no planning list (stand list, infrastructure, board, timeline, site plan, power and water plan), don’t count for rule hints, the number suggestion or key figures and have no object page. In the program, the PDF, the live view, on the TV and in the act link both behave the same.

  • “Add venue” above the timeline on the right: enter a designation (required, any text, e.g. “SM” or “WA1”, but not that of another stage or venue: music times, artist info and the import find them by designation) and optionally a name. The timeline shows “designation · name”.
  • Edit a venue: click the venue in the timeline, change designation or name, save. The designation must not be empty or belong to another stage or venue. When the designation changes, the artist info (access, catering) and the music times move with it, unless another stage or venue keeps the old designation or the new one already has its own texts.
  • Delete a venue: “Delete” in the same dialog, then confirm. This only works when it has no acts (“The venue still has acts. Move or delete them first.”) and no other planning data such as tasks is attached (“The venue is still in use …”).
  • Stage: clicking a stage only opens its music times (see below) and the link “Open object page”. You change its designation and name on the object page; artist info and music times move with it. A stage can only be deleted there.

Whoever may plan the whole program (agency) can add venues; whoever may plan a venue can edit and delete it. Every change is in the log.

This is governed by the data area Schedule, changeovers, tasks of each stage:

  • Agency: view and plan all stages, import.
  • Customer: view all stages and approve acts with status proposal (see Proposal and approval).
  • Sector lead, technical lead, contractor: view and plan the stages of their sectors.
  • Fee, travel and catering costs and the artist budget are only visible with the finance right (agency, customer); only the agency can change them. Without this right the amounts are also hidden in the log.
  • Licence plates of the acts are visible to whoever reads vehicle access permits (agency, sector lead, customer); only the agency can change them.
  • At the top the days of the event, from the first setup day (see Event) to the last event day, so soundchecks and blocking rehearsals before the event can be planned too. A day is an operating day from 6:00 to 6:00: an act from 22:30 to 00:30 belongs to the evening before. If today is no program day, the program opens on the first event day. Event days show at normal emphasis; setup and teardown days are muted and marked “Setup” or “Teardown”.
  • One row per stage with its number of acts. The hours run from the earliest start to the latest end of the day, music start and music end (see below) included; without acts and music times 14:00–24:00.
  • Band filled, dance school outlined, walking act dotted, street music double outline, DJ, speech, other dashed. Cancelled acts are faded and struck through. Acts in proposal carry a dashed ring before their name. Overlapping acts of a stage are stacked.
  • An act’s soundcheck or blocking rehearsal is its own magenta block in the row of its stage, on its day, labelled “Soundcheck · act” or “Blocking rehearsal · act”. Clicking it opens the act. It does not count as an act (number, “no program”), is not checked against music start and end and follows the kind filter of its act.
  • The legend below the timeline explains the shapes, soundcheck/rehearsal, statuses and lines.
  • The vertical line shows now while the day is running.
  • Zoom above the timeline on the right: 60 min, 30 min or 15 min per grid unit. Zoomed in, the timeline gets wider and scrolls sideways. The device remembers the choice.
  • Filter by kind above the timeline on the left: click one or more kinds (e.g. only dance schools or only walking acts); “All kinds” clears the filter. The filter is part of the address and stays on reload and when changing the day; hidden acts do not move the visible ones.
  • With the finance right, the page header shows the artist budget: fees plus travel and catering costs of all confirmed acts (Confirmed, Live, Done), net and to the cent; next to it “+ X € open” for acts in Proposal or Planned, if they have costs. The confirmed sum is the current plan of the budget group “Artists & programme” under Costs and revenue.
  1. “Add act” in the page header, or click an act in the timeline. Faster: in the timeline double-click a free spot of a stage you may plan. Stage, day and start (rounded down to 5 minutes) are then prefilled, the end one hour later; double-clicking an act opens that act.
  2. Enter act (name), stage, day, start and end. Times before 6:00 are after midnight.
  3. Type (band, dance school, DJ, speech, other, walking act, street music), status (proposal, planned, confirmed, live, done, cancelled; new acts are planned) and changeover after in minutes.
  4. With the finance right: fee, travel costs and catering costs in euros, net.
  5. With the vehicle access right: up to 4 licence plates of the artist vehicles. A plate may not be listed twice. Once the act is confirmed, they appear under Vehicle access for approval. They are deleted after the vehicle access retention period.
  6. Organisation (artist/act): an organisation of type artist/act (only for people who may plan the stage). Stand operators, customers and contractors are not offered; if an older act already has an organisation of another type, it stays selectable. “New artist organisation …” creates one with the act: name (prefilled from the act), salutation, first name, last name, street, house number, postal code, city and phone are required, the e-mail is optional and only needed to send the act link, the website (www.example.de is enough, https:// is added) is optional and appears in the program as PDF. Below there is always a website (www.example.de is enough, https:// is added): with an existing artist organisation chosen, it is the organisation’s; saving the act changes it for all acts of that organisation (empty = remove). Without an organisation (or with one of another type), the website applies to this act only. Anyone who may edit the act may do this, without the right on organisations. Tick Reported to GEMA: the first tick stores the time, shown as “Reported to GEMA (…)”; removing the tick clears it.
  7. Soundcheck/rehearsal (optional, one per act): rehearsal (soundcheck or blocking rehearsal), day (any program day, setup days included), rehearsal start and rehearsal end. It takes place on the act’s stage; if the act moves to another stage, it moves along. A program shift or dragging the act does not change its time. “None” removes it; deleting the act deletes it. Confirmed acts show it on the act link.
  8. On-site contact: first name, last name and phone, required when saving. Acts from the import or from before don’t have one yet; it is asked for at the next edit. Only people who may plan the stage see and change it; it never appears on the act link.
  9. Save. “Delete” removes the act after confirming; “Cancel” closes the dialog without saving.

Without the planning right on the stage, the act opens read-only; if its artist organisation or the act itself has a website, it is shown there as a link (opens in a new tab).

The agency proposes acts to the customer: choose status “proposal” in the act and save. In the timeline the act then carries a dashed ring before its name (see Status symbols).

The customer opens the act, sees name, time and the artist’s website and clicks “Approve”. The act is then planned, and the approval is in the log. Everyone who may plan the stage gets a notification (“Act approved: …”), except the customer. Only the customer sees “Approve”, and only on acts in proposal; the agency changes the status in the act as usual. The customer cannot reject: if a proposal doesn’t fit, the agency cancels or changes it.

Otherwise an act in proposal counts like a planned one: fee only as open share of the artist budget (forecast), timeline, bound tasks and shifts. It does not count as confirmed, so it gets no act link and no artist vehicles to approve.

“Program as PDF” at the top right of the timeline downloads the program of all days as a PDF, for example as a proposal to agree with the customer. Everyone who sees the program sees the button.

  • At the top the event and “As of” (date and time it was created), then per day the stages in the order of the timeline and below them the acts by start.
  • Per act: time (start–end), name, kind, status and the website of the organisation (artist/act), without one the act’s, as a clickable link.
  • The fee (net) is only in the PDF of people with the finance right; without it the fee is left out entirely.
  • Cancelled acts and days and stages without acts are left out. If the event has no acts yet, the PDF says “No acts planned yet”.
  • Only stages you may see. Travel costs, catering, number plates, the on-site contact and contact data are never in the PDF.
  • The labels follow the language you use Aetherial in.

“Import” in the page header (agency only). First preview, then import. If any row is faulty or names an unknown stage, nothing is imported; the preview lists every affected row. Stages are matched by number or name (offer), ignoring case. Acts already planned (same stage, start and name) are skipped.

  • Program overview (bands): one row per act with the columns date, stage, start, end and act; optional type (also “Walking-Act”, “Straßenmusik”), fee, travel costs and organisation (also “Organization”, “Management”, “Agentur”, “Firma”). The organisation is matched to an existing organisation by name, ignoring case; an unknown or shared name is an error (“Organisation “…” not found or not unique (organisations are not created).”), and nothing is imported. If a title sits above the header row, enter the header row number.
  • Dance-school grid: one sheet per day. First column the time (e.g. “14:30” or “14:30–15:00”), further columns per stage, dance schools in the cells. Each cell is a 30-minute slot; the same school in consecutive slots becomes one act.

A task can be bound to a stage’s program, for example “Front of Stage” 30 minutes before the first act:

  1. In the task dialog under “Bind to stage program”, choose the stage.
  2. Enter day, reference (start of first act, end of last act or start of an act, then choose the act) and offset in minutes, negative = before.

The start is then computed from the program and follows every change and import of that stage’s program on that day. Cancelled acts do not count, done tasks keep their time. A task bound to one act follows only that act. If the stage has no program left that day, or the chosen act is deleted, cancelled or moved to another stage or day, the task keeps its start and the task list shows a note. The offset counts real minutes, also across the clock change. Deleting the stage removes the binding.

When things run late on site (opening delayed, the mayor arrives later), the project lead (agency) shifts one act or all following acts of a stage. Aetherial first calculates a proposal with all consequences; only “Apply” changes the program.

  1. Click an act in the timeline, at the bottom “Shift program”: minutes (negative = earlier), scope (all following acts or only this act) and reason.
  2. “Calculate consequences”. The timeline shows the shifted acts at their new time, the original time dashed; the stage shows “Proposal +30 min”.
  3. The consequences are listed on the right:
    • Music end exceeded or an act before the music start (red): hard rules, apply only with a justification.
    • Acts shifted with their new time.
    • Overlap with another act of the stage and changeover too short (less than “changeover after” until the next act).
    • Security shifts bound to the stage (see Security posts) with their new time and extra hours (person hours, negative = fewer).
    • Extra security cost = extra hours × hourly rate of the post’s category (position or operations lead) from the deployment plan costs; only with the finance right. If an affected category has no rate it says “Hourly rate missing”.
    • Tasks bound to the stage, with their team.
  4. The scope can be switched at the top; a new proposal replaces the open one of the same stage and day. Open proposals of other stages are listed under “Further proposals”. An act may not leave its program day (06:00 to 06:00). Only the project lead sees proposals.
  5. “Apply” changes the acts, the bound shifts and tasks and sends a broadcast to the security operations lead, the technical leads and the teams of the bound tasks. If the program changed since the proposal, it is not applied: recalculate. If there is no recipient, it says “Nobody notified”. “Reject” only discards the proposal.

Dragging in the timeline: instead of step 1, drag the act with the mouse button held within its row to the left (earlier) or right (later). The act snaps to 5 minutes and shows its new time; Esc cancels, a click without moving opens the act as usual. On release Aetherial asks: act, old → new time with the minutes, scope (“only this act” preselected or “all following acts”) and an optional reason. “Calculate proposal” calculates the proposal as in step 2, continue with step 3; “Cancel” changes nothing. Dragging works only with a mouse or pen (on the phone and by keyboard use “Shift program” in the act), not for cancelled acts and not while a proposal of the day is open. Dragging never changes stage or day.

A forecast early warning on the weather page provides the proposal at the push of a button: “Propose shift” at the affected act calculates it with the minutes until the end of the period, all following acts and the reason “Weather: …”, and opens it here. The same steps from step 3 apply.

Bands and their management are not notified (still open).

The project lead maintains the music start and music end per day at the bottom right, e.g. “14:00” and “24:00”; empty = no limit. The page header and the live view show “Music 14:00–24:00” (only one set: “Music from 14:00” or “Music until 24:00”), the timeline a red dashed line for each.

Music times per stage: if a stage plays at other times, the project lead enters its own music start and music end per program day in the stage dialog (click the stage in the timeline) under “Music times per day”. Empty = the event value applies (shown greyed out in the field). The stage then shows its own times under its name (“Music until 00:30”) and as its own red lines in its row; the other stages keep the event’s lines. The timeline always spans from the earliest to the latest music time of all stages. The hard rules of a shift use the times of the shifted stage, and the live view shows them on the stage’s card. When the designation changes, the music times move with it (like the artist info); copying the event takes them over with shifted days.

“Live view” in the page header shows the act running now and the next one per stage; if its artist organisation or the act has a website, the name links to it (new tab, not on the TV). The page reloads every 15 seconds, so applied shifts show on phone and TV within 15 seconds. On large screens the type is larger.

“Artist info” in the page header (agency only) opens the artist info: access and catering per stage, general information, documents, GEMA report and a link without an account for every confirmed act.