Duty plan
The duty plan (Einsatzplanung) plans your own staff per hour and work area, for example the production office or a stage. It replaces the previous Excel grid. Checks warn, they never block.
Who sees it
Section titled “Who sees it”The “Duty plan” entry appears with read access to all of “Teams & people”: agency, sector lead and technical lead. Only the agency may plan, import and notify; everyone else sees the grid, the checks and “On duty” read-only.
Plannable are all agency persons of the tenant and everyone who is in a team of the event (temps, freelancers).
Days and grid
Section titled “Days and grid”At the top are the days: every day from the event’s first setup day to its last teardown day (see Event; if not set, the event days), extended by the objects’ time windows outside it and by every day that already has planned hours. Event days show at normal emphasis; setup and teardown days are muted and marked “Setup” or “Teardown”. Today opens by default, otherwise the first day. An operating day runs from 06:00 to 06:00; hours after midnight belong to the day before.
The grid has one row per hour (Time) and one column per work area. If a work area has positions, its name heads one column per position in the set order, plus “No position” while hours without a position are planned on that day. The cells show the planned persons, each name preceded by the profile photo from Staff (only for those who may see staff), otherwise the initials. People on duty at the same time appear side by side. Within a column each person keeps the same place in every hour; the place stays empty while they are off. Order: first hour, then name. The “+” to assign is always on the right of the cell.
Time windows of cancelled stands do not extend the days; days with shifts stay.
Several days next to the days shows several days one below the other, for example to plan across days. Each day at the top then toggles on or off; at least one stays selected. The selected days are in the address (?days=2027-06-10,2027-06-11), so they can be shared. Each day has its own grid headed by its date (and the “Setup”/“Teardown” marker) with the same columns as on its own. Assigning, dragging and editing work in every grid; dragging moves an hour only within its own day. Switching off shows one day again, the first selected one.
Planning (agency)
Section titled “Planning (agency)”- Add work area in the page header, with a free name. Under “Use sector” you can pick a sector of the event; it fills in the name (“number · name”), which stays editable before saving. Area and sector stay unlinked. A click on the column header opens “Edit work area” to rename or Delete it; deleting also removes its shifts.
- Work days (optional), when adding and in “Edit work area”: one checkbox per day from the first setup day to the last teardown day. None selected means every day. On other days the area’s column is hidden, e.g. sector areas only during setup. If hours are planned there anyway, the column stays visible with the note “Outside its days”. If no area is active on a day, it shows “No work area is active on this day.” Areas copied into the follow-up event keep their work days, shifted like the event; days outside the new frame are dropped, and if none remain the area applies to every day.
- Positions (optional), also in “Edit work area”: fixed posts within the area, e.g. reception, radio, cash desk. Enter the name under “New position” and “Add position”; change a name and save it with the check mark, change the column order with the arrows, delete with the bin. Deleting a position keeps its shifts, they move to “No position”. There is no required headcount per position.
- Assign: “+” in a cell opens the dialog with work area, position and hour preselected. Choose Person, From and Up to and including. Hours already planned stay as they are, also at another position of the same area (a person is in an area at most once per hour).
- Drag: dragging a person from the “Persons” list onto a cell plans them for that hour. Dragging a name in the grid onto another cell moves that hour (same day), also to another position.
- Replace or remove: click a name. “Replace with” another person and “Replace”, or “Remove from this hour”. If the area has positions, “Set position” sets the position of that hour.
- Swap in the page header: Person 1 and Person 2 swap all their hours of the selected day. With several days, the Day is chosen in the dialog.
Checks
Section titled “Checks”Above the grid the day’s checks are shown as counts (with several days, totalled over all selected days), each with its own symbol (see Status symbols).
| Check | Meaning | Where visible |
|---|---|---|
| Double booking | The same person is planned in two work areas at the same time | Name in the grid, hours per person |
| Unstaffed | Nobody is planned in the work area the whole day | Column header |
| Gap | Empty hour between the first and last staffed hour of an area | Cell |
| Rest time | Too few hours between the end of the previous duty day and the start of this day | Hours per person |
| Outside its days | Hours are planned on a day outside an area’s work days (only shown when there are some) | Column header |
“Unstaffed” and “Gap” count only areas active on that day.
The agency sets the minimum rest time (default 11 hours per German Working Hours Act, ArbZG § 5) in the tenant settings.
Hours per person
Section titled “Hours per person”The table below the grid shows the Hours of the day for each planned person (with several days the total, and the shortest rest time) and their checks, e.g. “Rest time 9 h (min. 11 h)”. Double-booked hours count once.
Notify affected persons
Section titled “Notify affected persons”Every change to a person’s hours (assign, move, replace, swap, remove, delete area) marks that person for that day. A change of the position alone does not: the message names work areas, not positions. The agency then sees “Changed duties not notified yet: N” and the “Notify affected persons” button.
- Each person receives one message per changed day with their new plan of the day, in their language, or the note that they are no longer scheduled.
- If the person turned on push on a device (see Sign in), the message arrives as push; tapping it opens “On duty”. Without push, or if the push does not arrive, it goes out by SMS.
- If sending fails, the person is listed with the reason under “Sending failed” and stays pending until a send succeeds. If their plan changes again, they are pending again.
On duty
Section titled “On duty”“On duty” in the page header shows per work area (without positions) who is working right now (“On duty now”, otherwise “Unstaffed”) and who comes in the next hour. The view fits a phone and a large screen in the production office and refreshes every 15 seconds.
The same names (names only, no contact details) also appear on the TV in the production office under “On duty” and in the mobile app collapsed above the list (“On duty · as of …”, offline too with the time of the last refresh). In the mobile app, “On duty” is shown to whoever may read teams & persons.
Import Excel (agency)
Section titled “Import Excel (agency)”“Import Excel” takes over the previous Excel plan, one sheet per day.
- Choose File (.xlsx), Day, Sheet and Header row (row number, default 1).
- “Preview” shows assignments, new work areas, names not imported and skipped rows.
- “Import” writes the plan. Afterwards “To the duty plan” leads back to the grid.
Sheet layout: first column time (e.g. 7, 07:00, 7-8, 7 Uhr), further columns per work area with its name in the header row, names in the cells separated by comma, semicolon, slash or line break.
- Names are matched exactly (case and spaces don’t matter). Unknown or ambiguous names are listed under “Not imported” with their line number; nothing is guessed.
- Missing work areas are created. Hours already planned stay, duplicates are skipped. Imported hours have no position.
- Rows whose first column is not a time are listed under “Skipped rows”.
- An import triggers no notification.