Skip to content

Temporary structures

The “Temporary structures” page takes every stage, tent and ride of an event through the notice to the building authority: prefill the notice, have the operator sign it, send it with the test book copy to the building authority, confirm receipt.

  • Agency and technical lead edit everything. Only someone not restricted to sectors or areas may set up the form and building authority.
  • Sector lead and customer read all structures.
  • Contractors and exhibitors read only structures on their own objects.
  • The operator name and the notice PDF contain contact details: visible only with the right to exhibitor contact details (Kontaktdaten Standbetreiber) or edit rights.
  • From transferred stand requests with the “Flying structure” step filled in (see Stand requests): the structure is created on the transfer to the stand list.
  • Via “Add structure” at the bottom of the page, e.g. for your own stages: pick the object and enter Type of structure, Inspection log number, Valid until, Dimensions, Area m², Height m, Competent person and Mobile. Only objects without a structure are offered.
Column Content
Structure Offer or label, below it the operator or stand number
Type Stage / grandstand, Tent or Ride
Test book Number and “valid until”; in red “Test book missing” or “expires …”
Notice Status with symbol (see Status symbols)
Inspection window Time window of the authority inspection and state of the SMS to the operator

“Test book missing” means: number or test book copy missing. “expires …” means: the test book ends before the last event day.

Below that, deadline hints such as “Documents due soon” or “Notice overdue” appear (“due soon” 7 days before). In the page header, “Notice deadline: … · N days left” shows the earliest notice deadline of the event. If one of the two deadlines (documents, notice) is missing, it shows “Deadlines not set up”, leading to the deadlines (“Create default deadlines”); without them there are no deadline hints.

Cancelled stands: if the notice is submitted or confirmed, the structure stays on the list with “Cancelled”, without hints or deadlines, and its files stay available. All others leave the list; nothing is deleted, and they return after reactivation. Cancelled stands do not count in the agenda and the TV view, get no new structure, neither automatically nor through the form, and “all missing notices” skips them.

Clicking a row opens the structure on the right: notice preview, hints and five steps with status.

  1. Notice prefilled: “Generate notice” prints the details from stand request, object and test book onto the original form. “Regenerate notice” replaces it as long as it is not signed yet.
  2. For signature with the operator: “Send for signature” sends the operator a link by email and, if a number is known, by SMS. Without an email address the link goes by SMS only; without both, “Operator has neither an email address nor a phone number.” appears. The link is valid until the last event day; once the event is archived, it shows “Link expired”. “Resend link” creates a new link; the old one stops working. What the operator sees: Temporary structure notice.
  3. Send to building authority: once the signed copy is there, “Send to building authority” emails it with the test book copy to the building authority (attachments at most 25 MB in total).
  4. Confirmation of receipt: when the building authority replies, optionally enter its reference or a note and choose “Confirm receipt”.
  5. Inspection on site: shows the inspection window; the operator must be present.

More actions:

  • “Upload signed copy”: the agency can also upload the signed PDF itself, e.g. if it came by post.
  • “Upload test book copy” (PDF, JPEG or PNG): replaces an earlier copy. Without an own copy, the one from the stand request applies.
  • “Edit details”: only in status Draft. The generated notice is discarded.
  • “PDF” opens the prefilled or signed notice.

“Generate all missing notices” in the page header generates the notice for every structure without one that you may edit. The result lists the generated structures and the reason for each failure.

Once per event, at the bottom of the page:

  1. Upload the city’s original form as PDF (“Upload form”).
  2. Enter the Building authority email.
  3. Under “Positions” set page, x, y, font and max. width per field (points from the bottom left, A4 = 595 × 842). A field without x is not printed.
  4. “Save settings”.